What should be inspected before painting?expand_more
Document peeling, stains, chalking, moisture, damaged substrate, failed joints, access and coating compatibility.
How should preparation be written?expand_more
List cleaning, scraping, sanding, patching, caulking and primer locations with an approval point.
Does pre-1978 paint change the project?expand_more
Qualifying disturbance can require a certified firm, containment, cleaning and records.
Who repairs rotten trim?expand_more
Assign the repair explicitly and define material, boundary and finished profile before painting.
How do I compare proposals?expand_more
Normalize surfaces, preparation, repairs, products, primer, coats, protection, exclusions and final checks.
Can exterior painting proceed after rain?expand_more
Only after substrate and conditions meet the selected coating requirements.
When might review be needed?expand_more
Associated structural or exterior alteration can change the path; confirm the full scope with Troutdale.
What records should I keep?expand_more
Keep the proposal, products, colors, changes, photographs, regulated-work records, warranty and punch list.