When can concrete be poured around Gresham?expand_more
Most of the year with the right precautions, but crews avoid pouring into hard frost or steady rain. Late spring through early fall gives the most predictable cure. Winter pours happen with blankets and admixtures, though scheduling gets weather-dependent.
How long before I can drive on a new driveway?expand_more
Foot traffic is usually fine after a day or two. Passenger vehicles typically wait about a week, and heavier loads longer. Concrete keeps gaining strength for weeks afterward, so avoid parking anything heavy near the edges early on.
Are cracks in a new slab a defect?expand_more
Fine hairline cracks are normal as concrete cures and are not a workmanship failure. What is not normal is a wide crack, a vertical offset between sections, or cracking that ignores the control joints. Ask what the contractor's warranty covers before signing.
Should I seal my concrete in this climate?expand_more
It helps considerably against moisture intrusion, freeze damage, and moss staining on shaded surfaces. Most sealers need reapplication every few years. Wait for the slab to cure fully before the first application, generally at least a month.
Is a paver driveway a better choice than concrete?expand_more
Pavers handle ground movement better because individual units can be reset, and they look sharper. They cost more up front and want occasional weed and settling maintenance. On soft, wet ground, both approaches still depend entirely on the quality of the base underneath.
How should a concrete contractor handle drainage?expand_more
The finished surface should move water away from the building without sending it onto neighboring property or trapping it at a garage. Ask the bidder to show the planned slope and any channel drain before forming. Drainage corrections belong in the scope, not after the slab is poured.
What is the difference between control joints and cracks?expand_more
Control joints create planned weak lines so normal shrinkage occurs in straight, less-visible locations. They do not guarantee a crack-free slab. Ask where joints will go, how deep they will be, and whether they are tooled during finishing or saw-cut afterward.
When should I pay the final concrete invoice?expand_more
Use the written payment schedule and save final payment until the agreed work, cleanup, joints, and obvious corrections are complete. Concrete still needs curing time, but forms, debris, adjacent damage, and scope completion can be checked before the final balance is released.