What should be inspected before painting?expand_more
Document moisture, peeling, chalking, damaged substrate, failed joints, stains, access and prior coating compatibility.
How should preparation be written?expand_more
List cleaning, scraping, sanding, patching, caulk, primer locations and the approval point before coating.
Does pre-1978 paint change the project?expand_more
Qualifying disturbance may require EPA-certified lead-safe renovation practices and records.
How do I compare paint bids?expand_more
Normalize areas, repairs, protection, products, primer, coat counts, colors, sheen, exclusions and final checks.
Who fixes rotten trim?expand_more
Assign the repair to a qualified contractor and define replacement material and finish before painting.
Can exterior painting continue in damp weather?expand_more
Only within the selected product's substrate, temperature and moisture requirements.
What should a color approval include?expand_more
Record product, color code, sheen and sample location for each surface.
What belongs at closeout?expand_more
Keep product and color records, photographs, regulated-work records when applicable, warranty and punch list.