How many coats should I expect?expand_more
Two coats over properly prepared and primed surfaces is the standard for exterior work and for meaningful color changes inside. A single coat over an existing similar color can be acceptable as a refresh. Make sure the bid states the number of coats explicitly.
Can painting happen in the winter here?expand_more
Interior work, absolutely, and winter is when crews have availability and sometimes better rates. Exterior work is limited by moisture and temperature, and while a dry February week occasionally allows it, results are less predictable. Most homeowners are better off waiting for summer.
Who supplies the paint?expand_more
Usually the contractor, at a trade price, with the brand and product line named in the bid. Confirm they are quoting a quality exterior line rather than a builder-grade product, because the coating itself is a small share of the total cost and a large share of how long it lasts.
How long should an exterior paint job last in this climate?expand_more
With thorough prep and a good coating, roughly seven to ten years on sheltered walls and often less on the weather-facing sides. Washing the house every year or two and touching up caulk lines noticeably extends that. Peeling within three years points to prep or moisture problems.
Do painters repair rotten trim before painting?expand_more
Some include limited carpentry, others exclude it entirely and expect you to arrange it. Ask directly, because painting over soft trim is wasted money. Getting rot handled first also lets the new wood be primed on all sides before it goes up.
How should peeling paint be handled?expand_more
Identify moisture, adhesion and substrate causes first. The written scope should state removal limits, repair responsibility, primer and the condition required before coating.
What information belongs in the color schedule?expand_more
List each room or elevation, manufacturer, product line, color code, sheen and approved sample location. Record substitutions in writing.
When do EPA lead-safe requirements matter?expand_more
Paid renovation work that disturbs painted surfaces in pre-1978 housing can trigger EPA RRP requirements. Verify applicability and firm certification before disturbance.