What should a flooring bid include?expand_more
Require measured quantities, product system, removal, preparation, testing, layout, transitions, trim, protection, exclusions and closeout.
Why test for moisture?expand_more
Moisture above the selected system's limits can affect adhesive, wood movement and finish performance and may indicate another problem.
How should hidden subfloor damage be handled?expand_more
Use a written stop point with photographs, measured extent, proposed repair, price and schedule effect.
When should flooring be delivered?expand_more
Coordinate delivery and acclimation with the manufacturer's instructions and stable interior conditions.
Who handles doors and appliances?expand_more
Assign moving, clearance adjustment, disconnection and reinstallation explicitly before work starts.
Can new flooring cover an uneven substrate?expand_more
Only when the substrate meets the selected product requirements after documented preparation.
Does flooring require a permit in Sandy?expand_more
Confirm the complete scope with Sandy Building Division, especially when structural or regulated-trade work is included.
What records should I retain?expand_more
Keep product and lot details, testing, preparation evidence, approved changes, care instructions, warranty and final photographs.